place · 3 records
Aroor

Water pumping resumes after repairs in Japan Drinking Water Project
Pumping has resumed following the repair of leaks in the Japan Drinking Water Project, but some areas in Kerala will face delays in receiving water.
1 outlet

Alignment for Kodungallur-Angamaly NH 544 bypass expected within two weeks
The detailed project report for the 18-km Kodungallur-Angamaly National Highway 544 bypass is nearing finalization with the alignment expected to be fixed within a fortnight.
1 outlet
NHAI relocates bus stops on Edappally-Aroor stretch to ease traffic congestion
NHAI has begun relocating bus stops deemed unscientifically situated away from U-turns and side road entrances along the NH 66 Edappally-Aroor stretch to alleviate traffic congestion.
1 outlet