← Today’s chart
BIZ2 sourcesIN ×217 SEPT 2026 21:51 IST

Mumbai Metro Rail Corporation to Charge Fees for Construction NOC

Headline by Prism · from 2 reports

The Mumbai Metro Rail Corporation has introduced a new fee structure ranging from Rs 1.9 lakh to Rs 5.4 lakh for construction no-objection certificates near Metro Line 3.

Reader brief

Through the Reader lens: The Mumbai Metro Rail Corporation will implement a revised fee structure for no-objection certificates (NOC) required for construction projects near the underground Metro Line 3 starting September 30. Fees are determined by the proximity of the construction to the metro corridor's center line, with higher charges for activity within 6 metres. This policy aims to protect the structural integrity and safety of the transit system by ensuring all nearby developments undergo technical scrutiny.

What to watch next

  • Implementation of the new fee structure starting September 30.
  • Impact on the volume of construction project approvals near the Metro 3 corridor.

Sources2

All filed from IndiaSingle originNamed India · IN-MH · Mumbai Metro Rail Corporation

← Today’s chart