The Mumbai Metro Rail Corporation has introduced a new fee structure ranging from Rs 1.9 lakh to Rs 5.4 lakh for construction no-objection certificates near Metro Line 3.
Reader brief
Through the Reader lens: The Mumbai Metro Rail Corporation will implement a revised fee structure for no-objection certificates (NOC) required for construction projects near the underground Metro Line 3 starting September 30. Fees are determined by the proximity of the construction to the metro corridor's center line, with higher charges for activity within 6 metres. This policy aims to protect the structural integrity and safety of the transit system by ensuring all nearby developments undergo technical scrutiny.
What to watch next
- Implementation of the new fee structure starting September 30.
- Impact on the volume of construction project approvals near the Metro 3 corridor.
Sources2
All filed from IndiaSingle originNamed India · IN-MH · Mumbai Metro Rail Corporation
- [1]The Times of India — MumbaineutralMumbai Metro Rail Corporation to charge up to Rs 5.4 lakh to obtain NOC for construction activities near underground Metro 3
- [2]The Times of India — MumbaineutralMumbai Metro corpn to levy up to Rs 5.4 lakh for Metro 3 construction NOC