The record
Written from the 1 report below. Nothing here is unsourced.
- The Northbound I-395 bridge over the Potomac River is scheduled for a $114 million rehabilitation project.
- Construction is slated to begin next year and conclude in fall 2029.
- The main span will be replaced with a fixed structure using accelerated bridge construction methods during a single 56-hour weekend closure.
- This project aims to modernize the 1950 bridge to meet current standards and improve traffic efficiency.
What to watch next
- Start of construction in 2027
- The 56-hour weekend closure for the float-in installation of the new span
- Coordination of heavy construction activity with the ongoing Long Bridge North project
Coverage1
1 report
English national1
All filed from India
Named United States · Arlington · Potomac River · Washington · AECOM · District Department of Transportation · Federal Highway Administration · Field News · Genesis Structures · Skanska USA Civil
The 1 report is listed beside the record.
Ask this story
Answers cite the reports above, or say they can't.