The record
Written from the 1 report below. Nothing here is unsourced.
- The PWD is launching a comprehensive project to upgrade Burari Road in New Delhi.
- The initiative includes reconstruction of a 7.1-km road stretch and the development of a 9.3-km drainage system.
- Road works involve utilizing both bituminous and RCC construction methods based on specific stretch requirements.
- These improvements aim to solve chronic waterlogging issues and enhance transportation infrastructure for local residents.
What to watch next
- Tendering process for the road construction work
- Coordination between road and drainage development teams
Who said what1
Only words found exactly in the article are shown, attributed and linked to the line they came from.
Parvesh Verma
PWD minister
1 quote · 1 outlet
“The objective is not to improve isolated portions of the road, but to upgrade the entire Burari corridor in an integrated manner”
In the article
…Bengali Colony. Drainage improvement will also be carried out on the Swaroop Nagar More-Burari Creek stretch. The drainage work has already been tendered. The road work is expected to be tendered in the next 10 days. “ The objective is not to improve isolated portions of the road, but to upgrade the entire Burari corridor in an integrated manner ,” the minister said. He directed PWD officials to ensure coordination between the road and the drainage work. He also said the work should be done in a manner that prevents repeated disruption for residents. Till the…
Coverage1
All filed from India
Named India · Burari · New Delhi · Parvesh Verma · Public Works Department
The 1 report is listed beside the record.
Ask this story
Answers cite the reports above, or say they can't.