Renovation of Kodikkunnu temple pond to resume
Headline by Prism · from 1 report
Renovation work on the Kodikkunnu Bhagavathi temple pond in Paruthoor, which was halted following a collapse of the side walls during heavy rain, is set to resume.
MathrubhumiThe brief
Written by software from the 1 report below.
- Construction at the Kodikkunnu Bhagavathi temple pond began in March with an initial budget of 6.8 million rupees.
- Work was halted after newly constructed side walls collapsed during heavy rains in late June.
- The revamped project will now cost approximately 10 million rupees and includes extensive landscape upgrades.
- Completion of the project is expected by April following the monsoon season.
What to watch next
- Water levels in the pond to recede after the Tula rain season.
- Resumption of construction work.
- Completion of renovations by April.
The points restate the reports; where one says why it matters, that is Prism's reading, not a reported fact.
Coverage
1 outlet
All filed from India
NamedIndia · Kodikkunnu Bhagavathi Temple · Minor Irrigation department · Nirmiti Kendra · Paruthoor · Pattambi
The 1 report is listed beside the record.
Corrections and versions
A correction says what was wrong and why. Every earlier headline and brief of this record is kept.
Something wrong?
Say what, and it arrives with this record's address filled in. A correction is welcome.
Ask this story
Answers cite the 1 report above, or say they can't.