Vettiyathodu pump house project to solve flooding in Padinjare Kallada
Headline by Prism · from 1 report
A new pump house project in Vettiyathodu aims to resolve chronic flooding issues in Padinjare Kallada.
1 of 32 monitored outlets · 1 report · Malayalam · checked
MathrubhumiThe brief
Written by software from the 1 report below.
- A new pump house will be constructed in Vettiyathodu to drain floodwater from low-lying areas into Ashtamudi Lake.
- The project utilizes a 60 HP motor system to address water stagnation that occurs when river levels prevent traditional shutter-based drainage.
- NHPC and the Padinjare Kallada Panchayat have signed a memorandum of understanding for the 6.82 million rupee project.
- Construction will be managed by the Minor Irrigation Department and is expected to be completed within 18 months.
Coverage
1 outlet
Indian-language1
All filed from India
NamedIndia · J. Ambikakumari · Kodikkunnil Suresh · Minor Irrigation department · NHPC · Padinjare Kallada Panchayat · Sajan Moideen · Ullass Kovoor
The 1 report is listed beside the record.
Corrections and versions
A correction says what was wrong and why. Every earlier headline and brief of this record is kept.
Something wrong?
Say what, and it arrives with this record's address filled in. A correction is welcome.
Ask this story
Answers cite the 1 report above, or say they can't.