The record
Written by software from the 1 report below. The points restate them; where one says why it matters, that is Prism's reading, not a reported fact.
- A new Vande Bharat train rake reached a top speed of 180 km/h during a successful loaded trial run conducted by the Research Designs and Standards Organisation.
- Several critical tests remain, including empty-condition oscillation trials, coupler force assessments, and emergency braking performance evaluations.
- The train is manufactured at the Modern Coach Factory in Raebareli and features advanced propulsion, braking, and safety systems.
- Final speed certification will only be granted after the Research Designs and Standards Organisation reviews all technical data from the upcoming tests.
What to watch next
- Completion of empty-condition oscillation trials
- Results of coupler force and emergency braking tests
- Final speed certification by the Research Designs and Standards Organisation
Coverage1
1 report
Indian-language1
All filed from India
Named India · Knorr-Bremse · Raebareli · Siemens · Indian Railways · Modern Coach Factory · Research Designs and Standards Organisation
The 1 report is listed beside the record.
Something wrong?
Say what, and it arrives with this record's address filled in. A correction is welcome.
Ask this story
Answers cite the reports above, or say they can't.
