organization · 3 records
Modern Coach Factory

New Vande Bharat train completes 180 km/h loaded trial run
Indian Railways has successfully completed a loaded trial run for a new Vande Bharat chair car rake at 180 km/h.
1 outlet

Vande Bharat train hits 180 kmph during high-speed trial run
A Vande Bharat train rake completed a high-speed trial run at 180 kmph in India.
1 outlet
Heavy LHB bogie corrosion worries Railways; toilet leaks, saline air blamed
Indian Railways is investigating reports of premature structural corrosion in LHB passenger coach bogies caused by toilet leakage and environmental factors.
1 outlet