The record
Written by software from the 1 report below. The points restate them; where one says why it matters, that is Prism's reading, not a reported fact.
- The Indian Railways conducted a high-speed trial of a new Vande Bharat Chair Car rake on the Nagda-Kota-Sawai Madhopur section.
- The train successfully reached 180 kmph during a loaded oscillation test monitored by the Research Designs and Standards Organisation.
- Several other technical trials, including emergency braking and empty-condition oscillation tests, remain to be performed.
- Completion of these tests is required before the train can receive final speed certification.
What to watch next
- Completion of empty-condition oscillation trial
- Completion of coupler force trial
- Completion of emergency braking trial
Who said what1
Only words found exactly in the article are shown, attributed and linked to the line they came from.
senior railway official
1 quote · 1 outlet
“Once the prescribed tests are completed, RDSO will examine the recorded data and results against the stipulated technical parameters. The final speed certificate will be issued only after satisfactory completion and evaluation of the entire trial programme,”
In the article
…are completed and the results are found satisfactory against the required technical parameters. The rake is equipped with a Siemens propulsion system and a Knorr-Bremse braking system. Story continues below this ad “ Once the prescribed tests are completed, RDSO will examine the recorded data and results against the stipulated technical parameters. The final speed certificate will be issued only after satisfactory completion and evaluation of the entire trial programme, ” the railway official said. Safety features in the Vande Bharat rake The Vande Bharat Chair Car rake comes with several safety and passenger-focused features. These include Kavach, an indigenously-developed Automatic…
Coverage1
All filed from India
Named India · Knorr-Bremse · Kota · Raebareli · Siemens · Indian Railways · Modern Coach Factory · Research Designs and Standards Organisation · Vande Bharat
The 1 report is listed beside the record.
Something wrong?
Say what, and it arrives with this record's address filled in. A correction is welcome.
Ask this story
Answers cite the reports above, or say they can't.
